A pedestrian and cycle path connected the two villages of Mokre and Bujaków. Trees, shrubs and grasses and perennials were planted along the entire, approximately 3.5 km long path. Three parking spaces with a bench were also installed. A number of nature-based solutions have been used for water retention and rainwater management: an infiltration ditch, basins and wetlands.
A pedestrian and cycle path connected the two villages of Mokre and Bujaków. Trees, shrubs and grasses and perennials were planted along the entire, approximately 3.5 km long path. Three parking spaces with a bench were also installed. A number of nature-based solutions have been used for water retention and rainwater management: an infiltration ditch, basins and wetlands.
Projekt finansowany jest z środków MF EOG na lata 2014-2021. Dofinansowany z środków WFOŚiGW w Katowicach.